|
Product Details:
|
Flow: | 30L/min | Temperature Control Accuracy: | ±1℃ |
---|---|---|---|
Flow Measurement Accuracy: | 0.5%FS | Heating Power: | 3KW |
Supply Pressure: | 0.1-3Bar | Service Temperature: | -20to45℃ |
Oil Temperature Control Range: | 20-140℃ | Communication Mode: | RS485/0-10V |
High Light: | 0.5%FS Oil Conditioning Equipment,30L/min Oil Conditioning Equipment,30L/min air cooled water chiller system |
SLOT 30L/min ±1℃ With Flow Measurement and Heating Lubricating Oil Conditioning
Overview
The oil conditioning system SeeLong SLOT conditions the engine or transmission lube oil temperature and oil supply pressure to a pre-definable set value and keeps it within a certain tolerance at steady state and dynamic operation of the unit under test UUT. The effective temperature value can be taken at the device or preferably at the UUT.
The effective pressure value must be taken at the UUT. Electrical heating is incorporated for preheating the lube oil and better control dynamics in transient operation.
Control principle
The PID control is carried out by an external system.( e.g. SeeLong SLOT). The temperature control is performed by a mixing valve (heat exchanger/electrical heating). The supply pressure control is handled by a control valve in the bypass between the supply and return lines to and from the unit.
Benefits at a glance
Structure of SLOT oil temperature control device
The device adopts closed cycle structure, the heat exchanger adopts plate heat exchanger, which has excellent response speed and cooling effect; PLC microcomputer control can facilitate the setting and display of temperature (sharing PLC with coolant temperature control).
The oil thermostatic device is mainly composed of plate heat exchanger, Siemens control valve assembly, control valve, sensor, stainless steel pipe and PLC control.
Main functions
FAQ
Q:What’s the minimum order quantity for our cooperation?
A: We support small trail order of 1 pcs for stock products.
Q: How can I learn more about the products?
A: Please leave your email and we will send you your electronic sample book.
Q: What’s your payment term?
A: Normally 30% T/T deposit, pay in full before shipment.
Q:What’s the lead time for my orders?
A: Dynamometers production cycle is 6-8 weeks, sensors prodction cycle is 2-3 weeks, other products please contact with us.
Q: How do we get the overall solution of the test bench?
A: Leave us your email, our technical staff will communicate with you about the detailed plan.
Q:Can I come to visit your factory?
A: Sure, you are always welcome to have a visit.
About Us
SeeLong Intelligent Technology (Luoyang Henan) Co., LTD., is a professional production of automotive power system test equipment high technology services enterprises. SeeLong is located in the Peony City(famous for peonies) -- Luoyang, which is also the ancient capital of 13 dynasties.
Why Choose Us
After years of development and accumulation, the company has become a well-known powertrain test equipment production enterprises. Specializing in engine test, transmission test, energy storage test, controls and electric motor test and other test equipment research, development and production service. The company has established long-term cooperation with tsinghua university, Shandong university and many other domestic scientific institutions. We have successfully passed the ISO9001 Quality System certification, obtained a dozen of invention patents and two software copyrights. We have provided professional services and equipment for more than 100 users at home and abroad and which is ongoing now and will continue in the future.
Prospect of cooperation
Friendly cooperation provides you both high quality products and long-term professional after-sales service.
Contact Person: Miss. Vicky Qi
Tel: 86-13271533630