|
Product Details:
|
Oil Circulation Capacity: | 40L/min | Working Temperature: | 70-140℃ |
---|---|---|---|
PLC: | S7-1200 | Control Accuracy: | ±1℃ |
Adjustment Time: | <5sec | Communication Mode: | RS485/0-10V |
Engine Power: | 250-400KW | Working Pressure: | <1.45Mpa |
Highlight: | 40L/min portable air chiller,70℃ portable air chiller,70℃ air cooled scroll chiller |
SLOC 40L/min 70-140℃ ±1℃ Lubricating Oil Conditioning
Control principle
The PID control is carried out by an external system.( e.g. SeeLong SLOC). The temperature control is performed by a mixing valve (heat exchanger/electrical heating). The supply pressure control is handled by a control valve in the bypass between the supply and return lines to and from the unit.
Overview
The main applications for SLOC are engines up to 400 kW, with customized solutions for larger engines. Several connection modes and unit options allow different applications like oil pan conditioning, oil pressure control and pre-heating. For oil conditioning on gear boxes, the SeeLong SLOC can also be used
The oil conditioning system SeeLong SLOC conditions the engine or transmission lube oil temperature and oil supply pressure to a pre-definable set value and keeps it within a certain tolerance at steady state and dynamic operation of the unit under test UUT. The effective temperature value can be taken at the device or preferably at the UUT.
The effective pressure value must be taken at the UUT. Electrical heating is incorporated for preheating the lube oil and better control dynamics in transient operation.
Benefits at a glance
Technical parameter
The maximum working temperature :70 ~ 140 ℃ |
Oil circulation capacity: 40L / min |
Reference engine power:250-400KW |
Medium viscosity: < 50cst |
Heating power: oil without heating |
System control ≤± 1℃ |
The allowable working pressure of oil circuit:1.45mpa |
The maximum temperature of cooling water is not more than 40 ℃ |
Power supply power: 1kW / 220V |
Heating power: oil without heating |
FAQ
Q:What’s the minimum order quantity for our cooperation?
A: We support small trail order of 1 pcs for stock products.
Q: How can I learn more about the products?
A: Please leave your email and we will send you your electronic sample book.
Q: What’s your payment term?
A: Normally 30% T/T deposit, pay in full before shipment.
Q:What’s the lead time for my orders?
A: Dynamometers production cycle is 6-8 weeks, sensors prodction cycle is 2-3 weeks, other products please contact with us.
Q: How do we get the overall solution of the test bench?
A: Leave us your email, our technical staff will communicate with you about the detailed plan.
Q:Can I come to visit your factory?
A: Sure, you are always welcome to have a visit.
About Us
SeeLong Intelligent Technology (Luoyang Henan) Co., LTD., is a professional production of automotive power system test equipment high technology services enterprises. SeeLong is located in the Peony City(famous for peonies) -- Luoyang, which is also the ancient capital of 13 dynasties.
Why Choose Us
After years of development and accumulation, the company has become a well-known powertrain test equipment production enterprises. Specializing in engine test, transmission test, energy storage test, controls and electric motor test and other test equipment research, development and production service. The company has established long-term cooperation with tsinghua university, Shandong university and many other domestic scientific institutions. We have successfully passed the ISO9001 Quality System certification, obtained a dozen of invention patents and two software copyrights. We have provided professional services and equipment for more than 100 users at home and abroad and which is ongoing now and will continue in the future.
Prospect of cooperation
Friendly cooperation provides you both high quality products and long-term professional after-sales service.
Contact Person: Miss. Vicky Qi
Tel: 86-13271533630