Send Message
Home ProductsCoolant Conditioning Machine

1KW 20L/Min Air Cooled Water Chiller System With Flow Measurement

Certification
China Seelong Intelligent Technology(Luoyang)Co.,Ltd certification
China Seelong Intelligent Technology(Luoyang)Co.,Ltd certification
I'm Online Chat Now

1KW 20L/Min Air Cooled Water Chiller System With Flow Measurement

1KW 20L/Min Air Cooled Water Chiller System With Flow Measurement
1KW 20L/Min Air Cooled Water Chiller System With Flow Measurement

Large Image :  1KW 20L/Min Air Cooled Water Chiller System With Flow Measurement

Product Details:
Place of Origin: China Luoyang
Brand Name: SEELONG
Certification: CMC
Model Number: SLOT-20
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: USD 5000 -12000 dollar
Packaging Details: 1500mmF*1000mm*2000mm wooden box
Delivery Time: 5-8weeks
Payment Terms: T/T
Supply Ability: 10 sets per month

1KW 20L/Min Air Cooled Water Chiller System With Flow Measurement

Description
Flow: 10L/min Temperature Control Accuracy: ±1℃
Flow Measurement Accuracy: 0.5%FS Heating Power: 1KW
Supply Pressure: 0.1-3Bar Service Temperature: -20to45℃
Oil Temperature Control Range: 20-140℃ Communication Mode: RS485/0-10V
Highlight:

1KW Air Cooled Water Chiller System

,

20L/min Air Cooled Water Chiller System

,

20L/min portable air cooled chiller

SLOT 20L/min ±1℃ With Flow Measurement and Heating Lubricating Oil Conditioning

 

Main functions :

  • Water / oil cooling constant temperature system: the circulating oil temperature is reduced to the set value through the heat exchanger and sent to the engine for use.
  • Control of proportional control valve: the heat exchange power can be changed and controlled by adjusting the outlet flow of cooling water, so as to ensure the constant temperature of engine oil fed into the engine and meet the test requirements.
  • Constant temperature system: the thermostatic device takes oil from the oil filter and returns to the main oil duct through cold and hot exchange.

Overview

 

The oil conditioning system SeeLong SLOT conditions the engine or transmission lube oil temperature and oil supply pressure to a pre-definable set value and keeps it within a certain tolerance at steady state and dynamic operation of the unit under test UUT. The effective temperature value can be taken at the device or preferably at the UUT.

The effective pressure value must be taken at the UUT. Electrical heating is incorporated for preheating the lube oil and better control dynamics in transient operation.

 

Structure of SLOT oil temperature control device

 

The device adopts closed cycle structure, the heat exchanger adopts plate heat exchanger, which has excellent response speed and cooling effect; PLC microcomputer control can facilitate the setting and display of temperature (sharing PLC with coolant temperature control).

The oil thermostatic device is mainly composed of plate heat exchanger, Siemens control valve assembly, control valve, sensor, stainless steel pipe and PLC control.

 

Control principle

 

The PID control is carried out by an external system.( e.g. SeeLong SLOT). The temperature control is performed by a mixing valve (heat exchanger/electrical heating). The supply pressure control is handled by a control valve in the bypass between the supply and return lines to and from the unit.

 

Benefits at a glance

 

  • ​Stainless steel tubing avoids dissociation of rust particles and guarantees long service life
  • High control accuracy and dynamics increase the testbed efficiency
  • Faster control response thanks to primary controlled oil circuit
  • he compact design enables installation close to the unit under test (engine or transmission) and, therefore, keeps the external oil volume small
  • Flexible in applications due to several connection modes, such as connection to the oil sump or to the oil

 

FAQ

 

Q:What’s the minimum order quantity for our cooperation?

A: We support small trail order of 1 pcs for stock products.

Q: How can I learn more about the products?

A: Please leave your email and we will send you your electronic sample book.

Q: What’s your payment term?

A: Normally 30% T/T deposit, pay in full before shipment.

Q:What’s the lead time for my orders?

A: Dynamometers production cycle is 6-8 weeks, sensors prodction cycle is 2-3 weeks, other products please contact with us.

Q: How do we get the overall solution of the test bench?

A: Leave us your email, our technical staff will communicate with you about the detailed plan.

Q:Can I come to visit your factory?

A: Sure, you are always welcome to have a visit.

 

About Us

 

SeeLong Intelligent Technology (Luoyang Henan) Co., LTD., is a professional production of automotive power system test equipment high technology services enterprises. SeeLong is located in the Peony City(famous for peonies) -- Luoyang, which is also the ancient capital of 13 dynasties.

 

Why Choose Us

 

After years of development and accumulation, the company has become a well-known powertrain test equipment production enterprises. Specializing in engine test, transmission test, energy storage test, controls and electric motor test and other test equipment research, development and production service. The company has established long-term cooperation with tsinghua university, Shandong university and many other domestic scientific institutions. We have successfully passed the ISO9001 Quality System certification, obtained a dozen of invention patents and two software copyrights. We have provided professional services and equipment for more than 100 users at home and abroad and which is ongoing now and will continue in the future.

 

Prospect of cooperation

 

Friendly cooperation provides you both high quality products and long-term professional after-sales service.

 

Contact Details
Seelong Intelligent Technology(Luoyang)Co.,Ltd

Contact Person: Miss. Vicky Qi

Tel: 86-13271533630

Send your inquiry directly to us (0 / 3000)