|
Product Details:
|
| Certifications: | CE, ISO 9001, ISO 45001, ISO 14001 | Constant Torque Range: | 0-4000rpm |
|---|---|---|---|
| Constant Power Range: | 4000-15000rpm | Warranty: | 1 Year |
| Max Working Speed: | 15000rpm | Rated Torque: | 315 Nm |
| Rated Power: | 132kW | Measurement Range: | 0-500Nm |
| Weight: | 1200kg | Rated Voltage: | 380V |
| Type: | Electric Dynamometer | ||
| Highlight: | 132kW AC dynamometer test system,new energy motor dynamometer bench,15000 RPM motor test system |
||
SSCH132-4000-15000 132kW New Energy Motor Test Dynamometer Bench System
1. 132kW New Energy Motor Test Dynamometer Bench System Component Description
| Component Name | Core Specifications | Brand |
| Electric dynamometer | Power: 132kW; Rated speed: 4000 rpm; Rated torque: 315 Nm; Maximum speed: 15000 rpm; Water cooling (flow rate ≥ 20 L/min) | Seelong |
| Torque flange | Measurement range: 0-500 Nm; Signal output: 4-20 mA; 0.2% FS; Repeatability error: ≤0.2 % FS | HBM |
| Variable frequency inverter system | Input voltage: three-phase AC 380V±10%; frequency: 50-60Hz; overcurrent protection value: 1.5 times rated current. | ABB |
| XLM-1000 Measurement and Control System | Communication interface: EtherCAT (≤1ms) / RS485 | Seelong |
| Data acquisition system | It includes a vibration acquisition unit, a temperature acquisition unit, an analog input acquisition unit, and a digital input acquisition unit. | Seelong |
| Power Analyzer | Voltage 0-1000V; Current 0-500A; Harmonics 0-50; Data update rate 10ms | Seelong |
| Battery Simulator | Output voltage 200-800V; Output current 0-400A | Seelong |
| Coupling | Diaphragm coupling, nominal torque 500 Nm, allowable speed 18000 rpm | Seelong |
| Protective cover | Material: Q235 steel plate, 3mm thick, with safety interlock device (trigger response time ≤0.1s). | Seelong |
| Cast iron plate | Material: HT300 (tensile strength ≥300MPa) Flat plate dimensions: 2000mm × 1500mm × 200mm (length × width × thickness) | Seelong |
| Motor bracket | The bracket adjustment range (motor center height) is 200mm-500mm, suitable for motors with diameters of 100-300mm. | Seelong |
![]()
2. 132kW New Energy Motor Test Dynamometer Bench System Technical Parameters
| Parameter categories | Technical indicators |
| Motor manufacturers | Seelong |
| Rated power | 132kW |
| Rated torque | 315Nm |
| Rated speed | 4000rpm |
| Maximum speed | 15000rpm |
| Constant torque speed range | 0-4000rpm |
| Constant power speed range | 4000-15000rpm |
| Torque sensor model | T40B |
| Torque sensor manufacturer | HBM |
| Torque sensor range (Nm) | 0-500Nm |
| Accuracy level | 0.2%FS |
3. 132kW New Energy Motor Test Dynamometer Bench System Advantages
Simultaneously capture key parameters such as vibration, temperature, voltage/current/harmonics, and record the operating status without omission.
Q235 steel plate protective cover + HT300 high-rigidity flat plate, coupled with 0.1s fast-response safety interlock, eliminates testing risks.
Automated operation reduces manual intervention, with a single motor test cycle of ≤25 minutes, significantly improving R&D and quality inspection efficiency.
4. 132kW New Energy Motor Test Dynamometer Bench System Applications
1) New energy vehicles: Compatible with models such as BYD Qin PLUS EV and XPeng G3i, completing comprehensive testing across all dimensions including power output, energy efficiency curves, dynamic response, and durability, covering R&D verification and mass production quality inspection.
2) Efficiency and reliability testing of 132kW motors for pumps, fans, compressors, etc.
3) Energy storage system: Monitors the temperature, vibration, and long-term stability of the inverter's associated motor.
4) R&D quality control: Complies with standards such as GB/T 18488-2015, supporting new product verification and mass production quality control.
5) Scientific research and teaching: A motor performance testing platform for universities and research institutions, supporting teaching and project research.
5. 132kW New Energy Motor Test Dynamometer Bench System Reference Standards
The bench design and testing process strictly adheres to the following industry standards to ensure the compliance, authority, and traceability of test data:
1) GB/T 18488.1-2015 Electric vehicle drive motor system - Part 1: Technical requirements
2) GB/T 18488.2-2015 Drive motor system for electric vehicles—Part 2: Test methods
3) GB/T 1032-2012 Test procedures for three-phase induction motors
4) GB/T 28046.3-2011 Road vehicles—Environmental conditions and testing for electrical and electronic equipment—Part 3: Mechanical loads
6. Motor Test Dynamometer Bench System Model List
| Model | Rated Power (kW) | Rated Torque (Nm) | Rated Speed (rpm) | Max Speed (rpm) | Constant Power Range (rpm) | Constant Torque Range (rpm) |
Torque Measurement Accuracy (%FS) |
| SSCH30-4500/18000 | 30 | 64 | 4500 | 18000 | 4500-15000 | 0-4500 | 0.05/0.1/0.2 |
| SSCH37-4500/18000 | 37 | 79 | 4500 | 18000 | 4500-15000 | 0-4500 | 0.05/0.1/0.2 |
| SSCH45-4500/18000 | 45 | 95 | 4500 | 18000 | 4500-15000 | 0-4500 | 0.05/0.1/0.2 |
| SSCH55-4000/15000 | 55 | 132 | 4000 | 15000 | 4500-15000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH60-4000/15000 | 60 | 143 | 4000 | 15000 | 4000-15000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH90-4000/15000 | 90 | 215 | 4000 | 15000 | 4000-15000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH110-4000/15000 | 110 | 263 | 4000 | 15000 | 4000-15000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH132-4000/15000 | 132 | 315 | 4000 | 15000 | 4000-15000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH160-4000/15000 | 160 | 382 | 4000 | 15000 | 4000-15000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH200-4000/12000 | 200 | 477 | 4000 | 12000 | 4000-12000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH250-4000/12000 | 250 | 597 | 4000 | 12000 | 4000-12000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH300-4000/10000 | 300 | 716 | 4000 | 10000 | 4000-10000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH350-4000/10000 | 350 | 836 | 4000 | 10000 | 4000-10000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH400-4000/10000 | 400 | 955 | 4000 | 10000 | 4000-10000 | 0-4000 | 0.05/0.1/0.2 |
Supports customized services: Speed range, torque range, test software functions, and special environment adaptation solutions can be customized according to requirements.
7. Delivery and After-Sales Support
1) Standard models: Ships within 90 days (including pre-testing before delivery to ensure quick installation upon arrival).
2) Customized models: Delivery in 90-120 days, covering international logistics and distribution to major regions worldwide including Europe, America, Southeast Asia, and the Middle East (sea / land transportation options available, including secure packaging and moisture-proof and rust-proof treatment).
3) Supporting services: We provide complete CE and ISO certification documents and certificates of origin, and a dedicated logistics specialist will follow up throughout the process to assist with customs clearance and ensure the safe and timely delivery of large equipment to the site.
1) Warranty commitment: 1-year warranty on core components (dynamometer, torque flange), lifetime maintenance; free troubleshooting and repair services during the warranty period, excluding damage caused by human error.
2) Technical support: 24/7 bilingual (English and Chinese) service, response time ≤ 4 hours
3) Installation, commissioning, and training services: The user is responsible for on-site basic installation. Seelong will dispatch two professional technicians to provide on-site guidance (including equipment positioning and calibration, and pipeline / line connection specifications); equipment commissioning will be handled entirely by us (including power-on testing, parameter calibration, and system linkage testing); 3 days of free professional operation training will be provided (covering equipment operation, parameter settings, daily maintenance, and troubleshooting) to ensure that operators are proficient in using large-scale equipment.
4) Remote service: Supports remote debugging via computer, system upgrades, and modular solution configuration guidance, quickly resolving technical issues during use and minimizing downtime losses.
8. FAQ
Q: What's the minimum order quantity for our cooperation?
A: We support small trail order of 1 pcs for stock products.
Q:How can I learn more about the products?
A: Please leave your email and we will send you your electronic sample book.
Q: What's your payment term?
A: Normally 40% T/T deposit, pay in full before shipment.
Q:What's the lead time for my orders?
A: Dynamometers production cycle is 6-8 weeks, sensors production cycle is 2-3 weeks, other products please contact with us.
Q: How do we get the overall solution of the test bench?
A: Leave us your email, our technical staff will communicate with you about the detailed plan.
Q: Can I come to visit your factory?
A: Sure, you are always welcomed to have a visit.
9. Our certificates
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Contact Person:
Miss. Vicky Qi
SEELONG INTELLIGENT TECHNOLOGY - GLOBAL AGENT RECRUITMENT IN PROGRESS
Tel: 86-13271533630