Diesel Engine Test Bench

Other Videos
September 24, 2025
Category Connection: Engine Test Dynamometer
Brief: Get a guided demo that shows common workflows and troubleshooting tips for the SSCD355-1500-3800 355kW Diesel Engine Electric Dynamometer Test Bench System. This video demonstrates how the system performs precision testing, simulates complex operating conditions, and achieves energy-efficient operation through its advanced four-quadrant inverter and high-speed data acquisition system.
Related Product Features:
  • Features a 355kW AC electric dynamometer with a maximum speed of 3800rpm for robust engine testing.
  • Utilizes a four-quadrant active variable frequency inverter system for efficient energy recovery back to the grid.
  • Equipped with the upgraded XLE-3000 measurement and control system for automated test cycles and high-speed data processing.
  • Includes high-precision data acquisition with ±0.2% FS torque accuracy and comprehensive parameter monitoring.
  • Supports compatibility with auxiliary equipment like transient fuel consumption meters and emission testing systems.
  • Designed for 24-hour continuous operation with advanced cooling and protection mechanisms.
  • Adheres to multiple national standards including GB17691-2018 and GB/T 18297-2024.
  • Offers intelligent operation with custom test editing, automatic report generation, and remote monitoring capabilities.
FAQs:
  • What is the minimum order quantity for the SSCD355-1500-3800 test bench system?
    We support small trial orders of 1 piece for stock products.
  • How can I learn more about the product specifications and capabilities?
    Please leave your email, and we will send you an electronic sample book with detailed information.
  • What is the standard payment term for purchasing this system?
    Normally, we require a 40% T/T deposit, with the balance paid in full before shipment.
  • What is the lead time for the SSCD355-1500-3800 test bench system?
    The production cycle for dynamometers is 6-8 weeks, while sensors take 2-3 weeks; contact us for other product timelines.
  • Can I visit your factory to see the test bench system in person?
    Yes, you are always welcome to visit our factory for a firsthand look at the equipment.